VLA Observing Guide Images

Pressure Diagram

800pxWIDARcorrelatorbands.png

VLA baseband with WIDAR subbands

800pxBlankFieldRMS.AC.png

rms noise in a blank field as a function of frequency for one baseband consisting of 8 contiguous sub-bands. Note the increased rms noise at the subband edges.

800pxBlankFieldRMS.interlace.png

rms noise in a blank field as a function of frequency for two basebands consisting of 8 contiguous sub-bands, where the basebands are separated by one-half of the subband width. Wherever signal in one baseband is compromised by edge effects, data from the other subband are substituted.

800pxPSTnarrow.png

Snapshot of the 8-bit sampler, 2x1GHz PST setup tool

800pxPSTwide.png

Snapshot of the 3-bit sampler, wideband mode PST setup tool

651pxOPTconfig1.png

OPT - Instrument Configuration: Baseband Settings

800pxOPTconfig2.png

OPT - Instrument Configuration: Subband Settings

800pxDoppler.png

OPT - Doppler Setting

Connect with NRAO

The NSF National Radio Astronomy Observatory and NSF Green Bank Observatory are facilities of the U.S. National Science Foundation operated under cooperative agreement by Associated Universities, Inc.