VLA Observational Status Summary 2014B

VLA capabilities September 2014 - January 2015

APIwind_October.png

APIwind_September.png

Lband_sweep.png

Lband_sweep_small.png

Figure 3

RcvrAvailDec12.png

RcvrAvailDec12_small.png

Figure 1

S-bandRFI.png

S-bandRFI_small.png

Figure 4

Pulsar Observing

While the WIDAR correlator will eventually allow flexible pulsar phase-binning and real-time correction for dispersion, those aspects of the correlator have not yet been commissioned.  Similarly the use of the phased array for high time-resolution observations is not yet possible for general use.

corr-cfg-fig:3bit_4x16x128MHz

Correlator configuration figure: 3bit_4x16x128MHz.png

corr-cfg-fig:8bit_1x16x128MHz

Correlator configuration figure: 8bit_1x16x128MHz.png

corr-cfg-fig:8bit_2x1x128MHz

Correlator configuration figure: 8bit_2x1x128MHz.png

corr-cfg-fig:8bit_2x8x128MHz

VLA OSS correlator configuration figure: 8bit_2x8x128MHz.png

corr-cfg-fig:8bit_2x8x128MHz

Correlator configuration figure: 8bit_2x8x128MHz.png

corr-cfg-fig:8bit_ac1+12_bd16

Correlator configuration figure: 8bit_ac1+12_bd16.png

corr-cfg-fig:8bit_ac1+12_bd16a

Correlator configuration figure: 8bit_ac1+12_bd16a.png

corr-cfg-fig:8bit_ac1+14_bd14

Correlator configuration figure: 8bit_ac1+14_bd14.png

corr-cfg-fig:8bit_ac1+14_bd16

Correlator configuration figure: 8bit_ac1+14_bd16.png

corr-cfg-fig:8bit_ac1+15_bd15

Correlator configuration figure: 8bit_ac1+15_bd15.png

Connect with NRAO

The National Radio Astronomy Observatory and Green Bank Observatory are facilities of the U.S. National Science Foundation operated under cooperative agreement by Associated Universities, Inc.