TAC Report Page

The Telescope Time Allocation (TTA) review process began to use a panel-based proposal review system in 2011.  This included NRAO's North American facilities: the Karl G. Jansky Very Large Array (VLA), the Robert C. Byrd Green Bank Telescope (GBT),  and the Very Long Baseline Array (VLBA).  In 2017, the Green Bank Observatory (GBO) and the Long Baseline Observatory (LBO) were created to run the GBT and VLBA, respectively, and therefore between semesters 17A and 19A the GBO and LBO maintained separate Telescope Allocation Committee (TAC) Report pages.  In 2019, the VLBA was merged back into the NRAO.  The table below summarizes this history and includes links to the various TAC Report pages that include proposal statistics and LST/GST pressure plots.

 

Semester

NRAOGBOLBO
25A VLA/VLBA
GBT
24B VLA/VLBA GBT
24A VLA/VLBA GBT
23B VLA/VLBA GBT
23A VLA/VLBA GBT
22B VLA/VLBA GBT
22A VLA/VLBA GBT
21B VLA/VLBA GBT
21A VLA/VLBA GBT
20B VLA/VLBA GBT
20A VLA/VLBA GBT
19B VLA/VLBA GBT
19A VLA GBT VLBA
18B VLA GBT VLBA
18A VLA GBT VLBA
17B VLA GBT VLBA
17A VLA GBT VLBA
16B VLA/VLBA/GBT
16A VLA/VLBA/GBT
15B VLA/VLBA/GBT
15A VLA/VLBA/GBT
14B VLA/VLBA/GBT
14A VLA/VLBA/GBT
13B VLA/VLBA/GBT
13A VLA/VLBA/GBT
12B VLA/VLBA/GBT
12A VLA/VLBA/GBT
11B VLA/VLBA/GBT