New Capabilities - 1.37

OPT Suite version 1.37 released 2026 April 1st


Known Issues

Subarray SBs

  • Interactive editing of loops in subarrays (cut/copy/paste/move in the SB tree) may cause unexpected issues. Please contact the NRAO Science Helpdesk for guidance if problems are encountered.

Improvements

OPT

Scheduling Block

Information tab

  • Corrected the issue with the Find LST Start Range button when the count was greater than one.

Static Report tab

  • Users can now display and edit the assumed start time in UTC.
  • Added Azimuth vs Elevation polar plot of sources used in the SB. This plot is generated for a defined assumed start time in LST or UTC.

Dynamic LST Validation tab

  • Antenna shadowing information has been added (applicable to D and C-configuration observations).
  • Evaluators are now grouped alphabetically.

Subarrays

  • Each subarray will show the total duration. This will allow users to see when a subarray is a different length.

SCT

Images tab of a source

  • Added Azimuth vs Elevation polar plot of source at the VLA.

RCT

  • Added ability to download and save search results.

Connect with NRAO

The NSF National Radio Astronomy Observatory and NSF Green Bank Observatory are facilities of the U.S. National Science Foundation operated under cooperative agreement by Associated Universities, Inc.