Facilities > VLBA > Documentation > Manuals > VLBA Observational Status Summary 2017A > Observation Preparation & Execution

Observation Preparation & Execution

Approximately 65% of all VLBA observations are scheduled dynamically, based on array and weather conditions predicted 1-2 days in advance.  Users allocated VLBA observing time, either on fixed dates or on a dynamically-scheduled basis, will be sent instructions for preparing observing schedules.  Most VLBA observations are scheduled using the VLBA SCHED program (Walker 2011).  Help with preparing VLBA observations is available through the NRAO Helpdesk.


Each VLBA program is run remotely from the SOC by VLBA operations.  No observing assistance by a VLBA user is expected, although VLBA operations should be able to reach the observer by telephone during the program, at a number that should be specified in the schedule file.  As the program progresses, the array operator monitors the status of the antennas and the station data path.  Logging, calibration, and flagging data are automatically recorded by the monitor and control system.  If necessary, the array operator can request local assistance from a site technician at each VLBA station.  Recorded media are automatically shipped from each VLBA station to the correlator specified by the observer.