Observation Preparation & Execution

Approximately 65% of all VLBA observations are scheduled dynamically, based on array and weather conditions predicted 1-2 days in advance.  Users allocated VLBA observing time, either on fixed dates or on a dynamically-scheduled basis, will be sent instructions for preparing observing schedules.

Most VLBA observations are scheduled using the VLBA SCHED program (Walker 2011).  SCHED includes a variety of extremely useful facilities cross-linking and error-checking the many options available for VLBA observing, and substantially simplifies the overall scheduling process.  A comprehensive SCHED User Manual includes instructions for obtaining and installing the software.

Help with preparing VLBA observations is available through the NRAO Helpdesk.

Each VLBA program is run remotely from the SOC by VLBA operations.  No observing assistance by a VLBA user is expected, although VLBA operations should be able to reach the observer by telephone during the program, at a number that should be specified in the schedule file.  As the program progresses, the array operator monitors the status of the antennas and the station data path.  Logging, calibration, and flagging data are automatically recorded by the monitor and control system.  If necessary, the array operator can request local assistance from a site technician at each VLBA station.  Recorded media are automatically shipped from each VLBA station to the correlator specified by the observer.

Connect with NRAO

The National Radio Astronomy Observatory and Green Bank Observatory are facilities of the U.S. National Science Foundation operated under cooperative agreement by Associated Universities, Inc.